detailing

  1. newsitem

    ZE homes Marjoleinlaan Wierden almost finished

    Contractor Ter Steege is renovating the 44 homes at the Marjoleinlaan in Wierden into zero-energy homes (ZE homes) on behalf of housing corporation Reggewoon. IAA Architecten produced the appropriate design for this …

  2. newsitem

    First ZE homes completed in Wierden

    At the Acacialaan in Wierden, housing association Reggewoon's first zero-energy homes (ZE homes) of the 28 and 44 homes to be renovated have been delivered. In November 2019, IAA Architecten was commissioned to carry …

  3. project

    SJHT Walhofstraat

    On this small plot, 12 apartments are housed on three floors of a newly developed building. To make the building appear smaller and to connect it to its surroundings, the corners are cut at an angle. The characteristic little residential building is completely covered with slate stone.

  4. project

    Interior GBTwente

    Founded in 2009, tax office GBTwente determines the property (WOZ) value for ten municipalities in Overijssel and Gelderland and handles the process of levying and collecting taxes. From the start, the now more than …

  5. project

    't Haarhuus

    In just 50 years, 't Haarhuus in Westerhaar has grown from a nursing home on the P.M. Hackstraat into a contemporary residential care complex on the Oranjestraat. The new complex consists of two buildings with a …

  6. project

    Maxon Motor

    Swiss high-tech company Maxon Motor is world leader in electric micro motors and components for i.a. medical equipment, the automotive and the aerospace industries. Since 1977 the company has a branch in Enschede. …